The SJR Gold Mining Project in Indonesia is located in the Pangulir area at the southern end of Sumbawa Island. The Project is owned by PT. Sumbawa Juta Raya and has a duration of 16 months, with a working scope covering civil and installation works for the plant production line and corresponding auxiliary production facilities, as well as individual-unit commissioning. The ore composition consists of 26% oxidized ore and 74% sulfide ore. Besides, the Project has an annual ore processing capacity of 1.2 million tons, with an operational lifespan of 8.5 years.
Pangulir Gold Development Project