The project is owned by PT Mintex, located in the Timburu area. Our scope is to construct a temporary camp to support the project. This typically includes providing basic facilities for workers and staff during the project’s construction or operational phase, ensuring a safe and functional living and working environment on site.

The Fats and Oil V Phase project by PT Dua Kuda Indonesia is an expansion of their fats and oils processing facility in Indonesia, aimed at doubling annual production of stearic acid and hydrogenated oil from 350,000 to 700,000 tons. Our scope of work covered piling construction for the facility, supporting the structural foundation of the plant. The project was completed and officially handed over to the owner in 2024.

The project is located in Mojokerto, East Java, and involved the construction of equipment foundations to support the installation and operation of heavy industrial machinery within the stainless-steel factory. Our scope covered civil and structural works, delivering strong and durable foundations specifically designed for the requirements of stainless-steel production equipment. This project played a key role in providing reliable structural support, ensuring smooth industrial operations and long- term facility stability. The work was successfully completed and formally handed over to the Owner with a Project Handover Certificate in 2022.

The Cibitung – Cilincing Toll Road Project is part of Jakarta’s Outer Ring Road II network, designed to strengthen connectivity between the eastern, northern, and western regions of Jakarta and West Java. The toll road stretches approximately 34 kilometers, linking Cilincing in North Jakarta to Cibitung in Bekasi. It plays a vital role in easing traffic congestion on the existing Jakarta–Cikampek Toll Road by providing an alternative route for logistics and industrial transport. The Project was completed with the a project handover certificate signed with the Owner in 2020.

This piling foundation project is for Chemical Grease Production Plant owned by Sino Zone Indonesia. The plant is located in Jakarta, designed to produce 200,000 tons of chemical grease annually. The Project was completed with the a project handover certificate signed with the Owner in 2021.

The Jakarta-Bandung High-Speed Railway, Indonesia’s first high-speed rail line, connects Jakarta and Bandung, reducing travel time from approximately 3 hours by car to 40–50 minutes by train. Spanning roughly 142 kilometers with elevated structures, tunnels, and viaducts, the line is designed to operate at speeds of up to 350 km/h. As part of this project, our scope included steel fabrication, formwork, and pier head casting,